• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2016 - Apr 2016
  • Estimated project cost $46,472
  • Australian Government contribution $46,472
  • Local Council/Shire Shire of Towong
  • State VIC

Project description

Location 1 has a steep corner with limited sight distance on a gravel road with a history of minor car accidents. Location 2 is a low section of gravel road that gets slippery in wet weather and has a failing pavement due to water penetration causing ongoing maintenance problems.

Location 1 - Widen the corner and remove the inside bank Location 2 - Transport fill gained from Location 1 to Location 2 to build up road pavement by 0.5 m and improve driving surface.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.