• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2016 - Jul 2016
  • Estimated project cost $146,292
  • Australian Government contribution $146,292
  • Local Council/Shire Tweed Shire Council
  • State NSW

Project description

The existing sealed road is in poor condition with numerous surface defects, cracking and pavement failures. The road is rough and provides poor ride quality to road users. Repair of the frequent and repetitive pavement and surface failures causes high maintenance expenditure. The cracked surface is allowing ingress of moisture and accelerated deterioration.

Rehabilitation of the road pavement by in-situ stabilisation and application of a new asphalt surface. The road alignment and width will remain similar to the existing road.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.