• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2016 - May 2016
  • Estimated project cost $92,427
  • Australian Government contribution $92,427
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The existing surface is old and affected by cracks especially along kerb and gutters. Some surface area has been delaminated. The existing surface is rough and noisy.

The proposed work includes resurfacing of the road with hot mix asphalt. Length = 474 m; Width = 8.2 m; Area = 3887 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.