• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - Jun 2016
  • Estimated project cost $306,170
  • Australian Government contribution $306,170
  • Local Council/Shire Launceston City Council
  • State TAS

Project description

Existing timber bridge deck, piers, and substructure require complete replacement.

A new single lane concrete bridge, including abutments, is proposed to be installed. This will reinstate the design load limit back to T44 (44 Tonne) rating as required in the AS1720 (Australian Standard AS 1720 Timber Structures Part 1)

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.