• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2015 - Mar 2015
  • Estimated project cost $72,553
  • Australian Government contribution $72,553
  • Local Council/Shire Town of Mosman Park
  • State WA

Project description

Isolated wheel rutting and significant cracking along all of surface pavement. Pit lids are now protruding as the asphalt surround had subsided and require re-adjustment.

Remove 30mm of Asphalt and replace with same. Re-grade and replace the lids of all drainage pits along the length of roadway to suit required levels.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.