• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Dec 2017
  • Estimated project cost $3,463,815
  • Australian Government contribution $3,291,371
  • State SA

Project description

The targeted section of road is low lying and requires forming and sheeting to get above natural surface level. The existing road material is marginal and turns to bulldust in summer and becomes very slippery after moderate rainfall.

The work will involve forming and sheeting of targeted sections with crushed rocks. Sheeting will be 150mm – 200mm in depth with 23m formation having a carriageway width of 9 metres and table drains on each side of the road.

Total cost of proposed project is $3,463,815

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.