• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Dec 2016
  • Estimated project cost $1,022,612
  • Australian Government contribution $963,959
  • Local Council/Shire Sunshine Coast Regional Council
  • State QLD

Project description

The proposed section has the following defects: extensive ravelling, oxidation and weathering of the asphalt surface and cracking in some areas. The surface has moderate failures (for example, potholes and patches).

Asphalt Resurfacing: Profile edges to key-in with the concrete kerb and channel; waterproofing and crack alleviation bitumen sprayed seal; and 50mm thick Dense Graded Asphalt Overlay (using 14mm nominal size aggregate).

Total cost of proposed project is $1,022,612

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.