• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Mar 2017
  • Estimated project cost $229,377
  • Australian Government contribution $150,000
  • Local Council/Shire Sunshine Coast Regional Council
  • State QLD

Project description

The proposed section has the following defects: moderate crocodile craking, heavy patching, ravelling, oxidation and weathering due to the age of the existign surface. The surface of the road has moderate failures (for example, pothoels and patches).

Asphalt Resurfacing: Profile edges to key-in with the concrete kerb and channel; waterproofing and crack alleviation bitumen sprayed seal; and 50mm thick Dense Graded Asphalt Overlay (using 14mm nominal size aggregate).

Total cost of proposed project is $229,377

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.