• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Dec 2017
  • Estimated project cost $435,000
  • Australian Government contribution $100,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing seal measures less than four metres in width and the existing road formation is less than 8 metres in width.

Where necessary, lengthen exiting culverts so that they are wide enough to allow construction of the road to the design width. replace sub standard culverts. Place culverts on road intersections. Realign intersection with Ducton Road to acceptable angle. Form road formation to 8 metres in width. Import, spread and compact 150 milimetres of compacted gravel. Place six metre wide spray seal. Place guideposts and linemarking as per appropriate guidelines and Standards.

Total cost of proposed project is $435,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.