• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Apr 2017
  • Estimated project cost $297,957
  • Australian Government contribution $274,337
  • Local Council/Shire Shire of Dowerin
  • State WA

Project description

4m wide seal breaking up very pot holed in variuos sections the road is not wide enough for heavy vehicles

Widen running surface to 10m with a reconstructed 7.2m two coat bitumen seal.In September 2016 we will be commencing the drainage works required, and then commencing the integration of lime into the subbase course with a gravel overlay placed on top, wet mixing, cement stabilisation and bitumen seal finishing during the month of October 2016

Total cost of proposed project is $297,957

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.