• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Feb 2017
  • Estimated project cost $36,409
  • Australian Government contribution $36,409
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road pavement as little to no gravel and becomes very rough causing problems for raw produce (fruit) being transported from farms.

Form the existing surface to design crossfalls . Import, spread, shape and compact gravel to 100mm thick at design crossfalls. Form table drains and cut off drains as required.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.