• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Mar 2017
  • Estimated project cost $41,966
  • Australian Government contribution $41,966
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road surface has minimal gravel and corrugates easily. Rock is exposed on some sections.

Reform the existing road surface to the required crossfalls and import gravel, spread and compact to 100mm thickness to the design crossfalls. Whre required, reform table drains and sut off drains.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.