• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2017 - May 2018
  • Estimated project cost $58,399
  • Australian Government contribution $55,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The road is a school bus route and a heavy vehicle route. The road is very narrow and the existing seal is failing and requires a reseal to maintain integrity. On the approaches to the bridge at straight line kilometre 4.40 There is insufficient road width for vehicles to safely pull over to allow oncoming traffic to pass.

Widen the existing seal by 600 milimetres. Place a reseal on the widened section of road and the existing seal. Construct safe passing areas to the bridge.

Total cost of proposed project is $58,399

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.