• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2019 - Jun 2019
  • Estimated project cost $23,972
  • Australian Government contribution $23,972
  • Local Council/Shire Gilgandra Council
  • State NSW

Project description

Single lane concrete causeway has developed lateral cracks above two (2) concrete pipes, the causeway also tends to wash out either end of the concrete slab when the creek rises.

Council intends to lengthen existing concrete causeway by 15 metres on both approaches to get it above top water level (TWL) at full flow. These extensions will incorporate cut-off walls to a depth of 1 metre on both sides of the extensions. A new slab will be poured over the existing slab to a depth 200mm and tied in to existing slab using starter bars. Both approaches will be reconstructed to suit new levels.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.