• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2016 - Dec 2017
  • Estimated project cost $302,485
  • Australian Government contribution $302,485
  • Local Council/Shire Shire of Irwin
  • State WA

Project description

The problem being addressed is the width and poor condition of the road shoulders and poor drainage.

Survey pickup, detailed design, widen road and install 3 Barrel culverts in low area, install surface drainage both side of the street, install rcp crossovers at all current residences

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.