• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2016 - Nov 2016
  • Estimated project cost $354,796
  • Australian Government contribution $354,796
  • Local Council/Shire Melbourne City Council (City of Melbourne)
  • State VIC

Project description

The existing asphalt road surface is oxidised with both substantial longitudinal and transverse cracking and loss of cross-sectional shape with undulating surface at the approach to intersections.

Proposed to cold plane profile the existing road surface to a depth of 50 millimetres for a length of 310 metres and a width of 16.5 metres and reinstate over the whole area with both 10 mm type H hot mix asphalt wearing course in traffic lanes and 10mm type V hot mix asphalt at approaches to intersections all to a depth of 50 mm

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.