• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2016 - Apr 2017
  • Estimated project cost $68,036
  • Australian Government contribution $68,036
  • Local Council/Shire Banyule City Council
  • State VIC

Project description

Extensive pavement and surface failures (Potholes, cracking and crocodile cracking). Road is in a rural environment and water penetration from table drains is a major problem. Road is classified as Collector.

Reshaping of table drains, construction of buffer strip on both sides of the road to maintain pavement integrity and prevent water penetration to the road surface. Surface profiling, repair of failed areas and resealing

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.