• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Jan 2017
  • Estimated project cost $130,678
  • Australian Government contribution $130,678
  • Local Council/Shire Glen Innes Severn Council
  • State NSW

Project description

The existing sealed pavement is narrow and in poor condition, requiring excessive road patching to meet service levels, and provides a rough surface for motorists.

Rehabilitation, including reshaping road verges and table drains to improve drainage and minimise water ingress into pavement; ripping the existing surface; minor widening and resheeting the road with a layer of gravel to improve the pavement strength; and bitumen sealing the road to 5.5 metres in width.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.