• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2017 - Apr 2017
  • Estimated project cost $351,433
  • Australian Government contribution $350,605
  • State NSW

Project description

The pavement is in poor condition with the evident of fatigue cracking, ravelling and potholes. The road pavement requires the strengthening structurally and resurfacing. Pavement Area = 4,250 sq.m

Repair failed sections or weak spots of the pavement with 140mm AC20 (Approx. 800m2)and 40mm AC10 Overlay full width

Total cost of proposed project is $351,433

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.