• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2017 - May 2017
  • Estimated project cost $252,610
  • Australian Government contribution $252,610
  • Local Council/Shire Frankston City Council
  • State VIC

Project description

Drainage issues due to poor underlying soil composition which is resulting in premature road surface cracking and deterioration causing safety risks for road users.

Install drainage along both sides of the road for 120m from Baileyana Street. Reconstruction of approximately 100m of Foot Street from Baileyana Street at a depth of 380mm and apply an asphalt overlay along the full length to improve driver safety. Works include construction of 70m of on-street parking and pedestrian pram crossings near Baileyana Street to provide a safer crossing point for school students and other pedestrians.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.