• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2017 - May 2017
  • Estimated project cost $279,957
  • Australian Government contribution $279,957
  • State NSW

Project description

Existing bitumen seal is 5.6 metres wide. Bitumen surface has lost its original shape and hold water when wet. Edge break has occurred to bitumen surface and constant maintenance required .

Remove the exiting bitumen seal. Rework and widen road formation to minimum of 4.5m from the centre line. Incorporate 2.5% lime stabilising agent into the pavement material. Compact pavement and Spray 10mm primer seal. Install guide posts and required road signs.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.