• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2016 - Dec 2017
  • Estimated project cost $783,000
  • Australian Government contribution $392,000
  • Local Council/Shire South Australian Local Government Grants Commission
  • State SA

Project description

The current pavement is failing and the unsealed pavement has become deformed requiring high levels of maintenance for heavy vehicle safety.

The works proposed include the realignment and reconstruction of the current unsealed pavement to a 10 metre pavement and 6.8 metre bitumen seal. The pavement will be constructed using crushed rubble and include the replacement of the stromwater drainage infrastructure.

Total cost of proposed project is $783,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.