• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2017 - Sep 2017
  • Estimated project cost $200,422
  • Australian Government contribution $200,422
  • State NSW

Project description

The existing road surface is affected by numerous cracks and pavement failures. It is rough and noisy. It is prone to further cracking, delamination of asphalt and potholes. Some sections of kerb and gutters are displaced and cracked.

The proposed work includes replacement of damaged sections of kerb and gutters, sealing of cracks, repair of failed pavement failures and resurfacing of the road with hot mix asphalt. Length = 335 m; Width = 8.4 m; Area = 2814 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.