• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Oct 2016
  • Estimated project cost $103,434
  • Australian Government contribution $103,434
  • Local Council/Shire Shire of Merredin
  • State WA

Project description

Surface correction, The road is rated for a network 4 RAV, the road surface is predominately sand and clay that potholes and ruts, the road has inadequate cross fall and doesn't drain creating the formation of large wet spots that can cause heavy vehicles serious safety concerns by punching through these areas; bogging the vehicle and causing loss of control. The damage to the road is significant rendering it in-passable.

Re-shape the road, gravel sheet to a depth of 150 mm, increase the width of 10 metres and re-establish the roadside drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.