• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2016 - Nov 2016
  • Estimated project cost $36,821
  • Australian Government contribution $33,759
  • Local Council/Shire Shire of Wyalkatchem
  • State WA

Project description

There has been excessive deterioration of the unsealed pavement, inadequate base course and exposed sub base leading to an unsafe carriageway, ineffective drainage and severe corrugations.

It is proposed to widen and gravel sheet, clean out the side drains and construct extra side drains to prevent further water erosion. The basecourse will be sheeted with 200mm of material, water bound and compacted to achieve a minimum 6 metre wide carriageway.

Total cost of proposed project is $36,821

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.