• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Feb 2017
  • Estimated project cost $354,590
  • Australian Government contribution $354,590
  • Local Council/Shire Penrith City Council
  • State NSW

Project description

The road was originally constructed in 1968 and is already failed with numerous potholes and patches due to the increasing traffic and inadequate pavement materials

It is proposed to mill to a depth of 150mm and replace with 100mm deeplift asphalt base and 50mm asphalt wearing surface for a length of 450 metres and a width of 12 metres

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.