• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Jun 2017
  • Estimated project cost $840,208
  • Australian Government contribution $840,208
  • Local Council/Shire Baw Baw Shire Council
  • State VIC

Project description

Pavement failures

1. Excavate and dispose of approximately 350mm pavement from existing road. 2. Compaction of the subgrade as found to 98% (Standard). 3. Lower Subbase: 170mm depth compacted existing stabilised material with 3% slow setting cementitious binder. Compact to no less than 98% of modified compaction. 4. Upper Subbase: 150mm depth compacted 20mm Class 2 crushed rock, compacted to not less than 98% 5. Interlayer: SAMI seal (or similar) over prime 6. Wearing Course: 30mm, size 10mm, Type HP, Class A10E PMP Asphalt

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.