• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2017 - Feb 2017
  • Estimated project cost $135,214
  • Australian Government contribution $113,148
  • Local Council/Shire Shire of Lake Grace
  • State WA

Project description

Thinning gravel along a section, encroaching grass and shrubbery, upgrading of culverts and signage.

Along the section of road between SLK 8.040 and 13.540, roads needs to have gravel surface resheeted. On same section cutback vegetation. Installation of headwalls at culverts located at SLK 10.765 and 14.810. Installation of a size B side road warning sign at intersection with Webb Road at SLK 14.054.

Total cost of proposed project is $135,214

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.