• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2017 - Jun 2017
  • Estimated project cost $426,794
  • Australian Government contribution $105,000
  • State NSW

Project description

The asphalt road surface is subsided and had failed in many places with rutting and pot holes on the road surface indicating road pavement failure.

Proposes to heavy patch damaged areas up to 200mm in depth to repair the road pavement failure and resurface (mill and fill) with a 40mm thick asphalt concrete overlay. Approximate area to be rehabilitated is 7020 square metres with dimensions 540m long x 13m wide

Total cost of proposed project is $426,794

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.