• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2017 - Jul 2017
  • Estimated project cost $42,171
  • Australian Government contribution $42,171
  • Local Council/Shire Corporation of the City of Whyalla
  • State SA

Project description

The road surface has deteriorated significantly and is too uneven to seal by renewing the existing two coat spray seal. Edge break is prevalent due to the absence of a kerb on the eastern side and ineffective drainage along this edge.

Council is proposing to edge profile to even and level the edges, construct a kerb and watertable along the eastern side of the pavement and and used a 35mm hotmix overlay to even/shape correct the existing surface level and renew the seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.