• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2017 - Feb 2017
  • Estimated project cost $17,788
  • Australian Government contribution $17,788
  • State NSW

Project description

The asphalt road pavement had failed with large potholes and rutting on the road surface.

To replace the full depth pavement with a 200mm thick asphalt concrete layer to repair the the subgrade and surface failure. Approximate area to be rehabilitated is 730 square metres with dimensions, 86m long x 8.5m wide area

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.