• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2016 - Nov 2016
  • Estimated project cost $257,827
  • Australian Government contribution $241,497
  • State NSW

Project description

The asphalt road surface is subsided, cracked and had failed in many places with rutting and pot holes on the road surface indicating subbase failure.

To remove and replace the road surface with a 100mm thick layer of heavy duty asphalt concrete layer to repair the subgrade and road surface . Approximate area to be rehabilitated is 3,450 square metres with dimensions, 314m long x 11m wide area.

Total cost of proposed project is $257,827

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.