• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2017 - Jun 2018
  • Estimated project cost $1,900,000
  • Australian Government contribution $1,112,167
  • Local Council/Shire Circular Head Council
  • State TAS

Project description

Road is significantly corrugated Footpath and kerb infrastructure is at end of useful life Road stormwater drainage is inadequate

It is proposed to resurface, re-profile and widen the existing road formation Kerb and channel/ underground piped drainage system is proposed for installation where none currently exists It is proposed that formalised car parking with a sealed surface be installed adjacent to the existing road formation

Total cost of proposed project is $1,900,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.