• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2018 - May 2018
  • Estimated project cost $540,000
  • Australian Government contribution $440,000
  • Local Council/Shire City of Glen Eira
  • State VIC

Project description

The road surface, pavement and kerb and channel are dilapidated condition. The road has deteriorated over the years and showing many signs of failures. Trees on the nature strip have pushed the road kerb and channel and made the road very uneven and causing drainage problems. There is no sufficient drainage in the street to drain the road surface runoff.

The work involves installing new kerb and channel, reinstating failed pavement sections, providing asphalt patching to correct unevenness, asphalt resurfacing and providing adequate drainage to the street.

Total cost of proposed project is $540,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.