• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2017 - Dec 2017
  • Estimated project cost $24,785
  • Australian Government contribution $24,785
  • Local Council/Shire Mid Murray Council
  • State SA

Project description

Insufficient road base material left on road resulting in poor drainage and rough driving conditions for motorist. Poor quality of road base material used when road was either constructed or resheeted last time.

Resheeting the road surface at a pavement thickness 100 millimetres with limestone crushed rubble sourced 15kms away from the site

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.