• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2017 - Oct 2018
  • Estimated project cost $125,962
  • Australian Government contribution $125,962
  • Local Council/Shire Wellington Shire Council
  • State VIC

Project description

Existing timber bridge is in the last stages of its useful life and unsuitable for rehabilitation. The bridge is showing signs of wear and the structural integrity of the bridge elements has decrease to a point where it is currently load limited at 8T. The bridge provides for local, recreational and forestry access.

To bring the bridge up to date with current standards, it is proposed to replace the existing bridge with concrete/steel structure, capable of supporting a minimum 44T.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.