• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2017 - Jun 2018
  • Estimated project cost $434,462
  • Australian Government contribution $144,821
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Poor vertical geometry, insufficient pavement thickness for the regular heavy vehicle use that exists and the existing sealed width is only 4 metres.

Reconstruction and widening from 4.0 metre seal to 6.0 metre seal plus 1.0 metre unsealed shoulder on each side of the road. Increase pavement thickness, construct horizontal and vertical geometry to the appropriate standard and improve drainage via upgrading culverts where required and forming effective table drains. Replace signage and guide posts as required.

Total cost of proposed project is $434,462

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.