• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Feb 2018
  • Estimated project cost $107,056
  • Australian Government contribution $107,056
  • State WA

Project description

Existing cul de sac geometry does not allow safe turning movement for waste truck. Existing pavement surface, kerb and dilapidated slab footpath has reached end of asset life and requires resurfacing and/or replacement.

Road widening of cul de sac head to allow waste truck turning movement. Profile and resurfacing of existing pavement including new kerb. Installation of drainage and concrete footpath.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.