• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2017 - Apr 2018
  • Estimated project cost $155,251
  • Australian Government contribution $112,628
  • State WA

Project description

Existing cul de sac geometry does not allow safe turning movement for waste truck. Existing pavement surface and kerb has reached end of asset life and requires resurfacing and replacement. Road needs drainage improvements and no existing footpath.

Road widening of cul de sac head, profile and resurfacing of existing pavement including new kerb. Installation of drainage and concrete footpath.

Total cost of proposed project is $155,251

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.