• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Dec 2017
  • Estimated project cost $78,088
  • Australian Government contribution $78,088
  • Local Council/Shire City of Armadale
  • State WA

Project description

Road has minor longitudinal and transverse cracking and other surface defects. Road surface is at the end of its life. Kerb is in poor condition and will need to be completely replaced.

Repair surface defects. Install new kerbs to both sides of road. Reseal road with 30mm thick AC10 asphalt.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.