• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2017 - May 2018
  • Estimated project cost $458,371
  • Australian Government contribution $150,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing pavement is failing. Some sections of existing culverts are failing. The existing seal and shoulder widths are below the standard required for the classification of road.

Reconstruct and widen the existing pavement to form a 6.0 metre wide seal with 1.0 metre of unsealed shoulder each side. Repair or replace failed culverts as appropriate and form table drains to effectively remove surface water from the road structure.

Total cost of proposed project is $458,371

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.