• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2017 - May 2018
  • Estimated project cost $35,000
  • Australian Government contribution $35,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Sections of the existing road have little to no gravel resulting in corrugations and potholes and the road becomes very slippery in wet weather.

Where required, form the existing road surface to the required crossfall then import, spread and compact gravel to 100 milimetres in thikness. Clear or form table drains as required and place guideposts where needed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.