• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2017 - Nov 2017
  • Estimated project cost $154,325
  • Australian Government contribution $60,000
  • State NSW

Project description

Road pavement is cracked and failed in many places with potholes and and rutting.

To mill and remove 40mm layer of road surface, repair the failed base layer and resurface the road with a 40mm thick asphalt concrete layer. Approximate area to be rehabilitated is 1650 square metres with dimensions 275m long x 6.0m wide.

Total cost of proposed project is $154,325

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.