• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2017 - Oct 2017
  • Estimated project cost $830,000
  • Australian Government contribution $135,884
  • Local Council/Shire Byron Shire Council
  • State NSW

Project description

Road has extensive potholing and sections of failed pavement, insufficent surface drainage (defective kerb and gutter in places) and no drainage of subsoil.

Replacement of defective kerb and gutter. Placement of subsoil drainage along southern side of 700m corridor. Remove existing pavement at depths of 165mm and 345mm as required throughout and replace with 120 and 300mm of complying gravel rodbase along 700m of the corrridor from Warambool and Coomburra Crescent intersection west. 700m of the corrridor from Warambool and Coomburra Crescent intersection west to be surfaced with 45mm AC14.

Total cost of proposed project is $830,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.