• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Apr 2018
  • Estimated project cost $96,358
  • Australian Government contribution $96,358
  • Local Council/Shire Shire of Boddington
  • State WA

Project description

Rejuvenation is required IE the existing pavement is cracked and ageing and nearing the end of its useful life and a new seal needs to be applied to protect and rejuvenate the current seal and to preserve the asset.

Crack sealing, followed by a reseal using 14mm/7mm polymer modified bitumen from straight line kilometre 3.0 to straight line kilometre 4.0 and from straight line kilometre 7.4 to straight line kilometre 8.4 as this is a flexible seal well suited to bridging cracks so as to prevent the problem recurring.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.