• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2018 - Jul 2018
  • Estimated project cost $163,144
  • Australian Government contribution $163,144
  • Local Council/Shire Clarence Valley Council
  • State NSW

Project description

The existing bridge is of timber construction. The timber substructure has deteriorated to the extent that the bridge requires replacement.

The proposed works will replace the existing 8.4 metre long single lane timber bridge with a two lane concrete twin cell box culvert.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.