• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2017 - Jun 2018
  • Estimated project cost $981,217
  • Australian Government contribution $475,400
  • Local Council/Shire Brimbank City Council
  • State VIC

Project description

The existing road pavement exhibits oxidation of the asphalt surface, areas of significant cracking and roughness. In addition significant lengths of concrete kerbing are in a poor condition.

The project includes the following major aspects - Rehabilitation of 702 metres of existing road pavement and resurfacing with asphalt, reconstruction of 1586 metres of existing kerb and channel, reconstruction of existing vehicle crossings where required, reconstruction of all damaged footpath, construction of 620 metres of underground drainage works and the construction of a 16 space indented parking bay.

Total cost of proposed project is $981,217

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.