• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2019 - Apr 2019
  • Estimated project cost $576,517
  • Australian Government contribution $280,000
  • Local Council/Shire Hobsons Bay City Council
  • State VIC

Project description

The pavement has lost shape with failures and cracking along the length of street. The existing kerb and channel has subsided and holds water in various locations. The kerb and channel needs to be reconstructed and new drainage needs to be installed to eliminate ponding of water. The pavement reconstruction is required with regulation layer and wearing course to address failures and safety risk for passing vehicles.

Reconstruction of kerb and channel, installation of new drainage to service road and full width reconstruction of road pavement and surface to current standard

Total cost of proposed project is $576,517

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.