• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2019 - Feb 2020
  • Estimated project cost $173,831
  • Australian Government contribution $173,831
  • Local Council/Shire City of Lithgow Council
  • State NSW

Project description

Previously a crown road and now transferred to Council, this road is unformed and nearly inaccessible by a two-wheel-drive passenger vehicle. Severe rutting and extremely rough surface.

Road will require construction of the sub-base and base and the application of a 5 metre wide 20/10 two-coat bitumen seal. Also included will be vegetation control and reconstruction of roadside drainage, including the replacement of stormwater pipes across residential driveways.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.