• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2019 - Dec 2019
  • Estimated project cost $24,865
  • Australian Government contribution $24,300
  • Local Council/Shire Shire of Mukinbudin
  • State WA

Project description

Poor running surface and inadequate drainage and signage.

Section 1 - Over the entire nominated section carry out reconstruction and gravel re-sheet with 150mm of gravel and improve drainage and signage. Section 2 - At locations with a poor running surface and/or inadequate drainage and signage reconstruct as required to rectify the problem at that location. In every case this will involve a gravel re-sheet with 150mm of gravel.

Total cost of proposed project is $24,865

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.